Cas d’usages
FTTH Issue Resolution Management and Corrective Action Tracking
Dotic’s solutions streamline defect management and provide full transparency across all corrective actions and field interventions.
Improve Communication Reliability and Enhance Process Transparency
After work acceptance or quality control inspections, issues may be identified in both field conditions and data records.
These may include:
- infrastructure defects or installation issues
- non-compliant equipment
- inconsistencies in geospatial (GIS) data
- incomplete or inaccurately recorded network assets
These discrepancies are formally logged as issues that must be resolved before final project approval.


Ensure Reliable Communication and Full Transparency Across Your Processes
Efficiently Monitor and Manage Corrective Actions
Once issues are identified, resolving them requires a structured and efficient workflow:
- prioritizing issues based on severity and impact
- assigning corrective actions to the relevant field teams
- scheduling corrective interventions
- tracking resolution progress in real time
- validating issue resolution after intervention
Effective corrective action management ensures continuous network compliance and improves overall infrastructure quality.
Ensure Seamless Integration Between Field Operations and Operational Management
Efficient issue management depends on seamless data flow between field operations and management teams.
In the field:
- issues are captured directly through a mobile field application
- anomalies are geolocated and fully documented
- data is synchronized in real time
From the office:
- teams visualize issues within a Web GIS platform
- monitor resolution progress
- manage and prioritize corrective actions
- validate completed work
This end-to-end continuity eliminates data loss and accelerates issue resolution across the network.
Ensure Full Traceability of Issues and Their Resolution
Chaque réserve doit pouvoir être :
- suivie dans le temps
- associée à une intervention
- documentée à chaque étape
- validée après correction
Cette traçabilité est essentielle pour garantir la conformité des travaux et sécuriser la réception finale. Elle constitue également un élément clé pour justifier les corrections réalisées auprès des donneurs d’ordre.
Enhance Operational Quality and Transparency with Data-Driven Insights
A structured approach to issue management helps to:
- accelerate issue resolution
- improve infrastructure quality
- ensure reliable geospatial (GIS) data
- secure project deliverables
- enhance coordination across stakeholders
It plays a critical role in ensuring overall network quality and driving long-term improvements in field operations management.
Key Steps in FTTH Work Completion and Acceptance Process
Managing issue resolution is part of a comprehensive workflow that includes several complementary steps:
Geospatial Data Quality Control
-
Ensure Data Compliance and Consistency Before Integration into GIS Systems
Intervention Planning and Monitoring
- Plan and Prioritize Corrective Actions for Efficient Field Issue Resolution
FTTH Work Completion Acceptance and Validation
-
Ensure Proper Execution and Detect Issues in the Field